Product roadmap · Draft V0.2

Orbit
a journey outward, and back.

app_skeleton → Orbit  ·  Major.Minor.Patch  ·  thirteen waypoints along the cosmic distance ladder

“Each stage blooms and grows, much like each concentric ring of the cosmic distance ladder — more and more is included in the scope, and the universe, at once, becomes new and old.”

Major VX.n.n

Breaking changes to the module contract — existing modules need review.

Minor Vn.X.n

New capability, backward compatible — nothing existing breaks.

Patch Vn.n.X

Fixes only. No new capability, no compatibility change.

First four majors ~6 months apart · annual from V5 · minors quarterly · patches as required

The route

Out along the ladder, and back by a different road.

Every major release, in order — condensed from the full quarterly schedule. Proposed waypoints past Laniakea are still open for discussion.